Read the pattern
Gather the SPU service record, union and meter setting, building entry, legal address, route evidence, property plan, prior repair, material, leak location, slope, and surface constraints.
Queen Anne plumbing field guide
Seattle's service boundary gives the private line a specific route from the city union to the building connection. Property conditions can complicate that route, especially across hardscape, slope, or shared access.
Call to make a plan877-702-1610Decision terrace 10
Gather the SPU service record, union and meter setting, building entry, legal address, route evidence, property plan, prior repair, material, leak location, slope, and surface constraints.
Do not excavate from an assumed straight line or use a city control. Utilities, unsupported soil, retaining features, traffic, and water-filled work areas need controlled planning.
SPU says the owner installs and maintains the private water line from the city union to the building. New, replaced, or repaired outside piping needs required SPU inspection before cover.
Define endpoints, material and size, trench route, cover, slope transitions, backflow, shutoff, public coordination, inspection, pressure test, backfill, paving, landscape, and as-built documentation.
Collect the inspection report, photographs before cover, material record, measured route, test, restored service condition, surface status, and a map useful to later owners.