Leave the full private line visible for inspection

SPU requires inspection of the entire outside service piping when it is newly installed, replaced, or repaired. A photograph or video is not a substitute if the pipe has been covered.

Call to make a plan877-702-1610

Decision terrace 11

Move from evidence to a bounded authorization

01

Read the pattern

Before scheduling, confirm the address, exposed endpoints, completed joints, material markings, tracer provisions, cover conditions, access, water in the trench, corrections, and readiness of the whole segment.

02

Hold the safety line

Protect an open trench from occupants and weather. Do not request inspection where the line is underwater, hidden, unsafe to reach, or covered by stored material.

03

Place the Seattle boundary

SPU performs the utility service inspection and provides its report. Related fire, backflow, plumbing, street, or construction inspections can remain separate depending on the project.

04

Write the visit

Assign scheduling, site access, failed-inspection correction, reinspection cost, weather protection, backfill timing, surface restoration, and report retention to named parties in the contract.

05

Keep the closing evidence

Do not authorize cover until approval is documented. Store the inspection report with route measurements, material details, pressure results, and pre-backfill images.

Current public source

Check the authority behind the boundary

SPU private water line inspections

Continue the route

Related property decisions

Relationship

Queen Anne Home Water Terraces is an independent lead-generation website, not a plumbing contractor. Calls may connect you with an independent service provider. Confirm the provider's identity, Queen Anne coverage, license, bond, insurance, availability, pricing, and terms directly.

Read the referral disclosure
Discuss the request877-702-1610